Tuesday, 30 June 2015

Measurement 5 (QSB3115)

This module taught by 2 lecturer - Mr. Simon Chee and Sr. Ramar.

Mr. Simon explain to us how to use MYCESMM on civil engineering works. Mr. Simon covered the RE wall installation, rail track measurement, earthworks measurement and prestress measurement.

Sr. Ramar introduced us the measurement for cold water installation, electrical installation, sanitary installation, fire protection and air conditioning installation.

In this semester, Sr. Ramar prepared assignment for us and Mr. Simon prepared mid term test for us.

Both of these civil engineering works and M&E works usually are not prepared and covered by consultant's QS. However, through out this module, I able to understand the way to measure and tender preparation of both civil engineering works and M&E works.

I believe this knowledge will be used in the future.

Professional Practice 2 (QSB 3614)

Professional Practice is a very interesting module. This module cover the work that I have been did during the internship period. Through out this module, it explain to me more detail of the work I did before. This module provide me an overview of professional and contractual responsibilities of a QS in the consultancy setup from the inception stage to the final account stage.

Our lecturer, Sr. Eddie also explain to us more detail on PAM FORM 2006 with & without quantities, Fidic form of contract and also JKR contract. Through out the period, i'm able to define the roles and responsibilities of the various parties involved in construction contracts in relation to particular clauses in the contract. Besides, I also able to explain the various construction contracts, limitations and constraints and define issues in interpreting the contract clauses of construction contract.

Sr. Eddie also let us prepare seminar for each topic and present during the tutorial class. The seminar improve our presentation skill, communication skill, teamwork and also the other soft skill. Besides, the group assignment also very interesting. The assignment give us some scenario happened in the actual practice and let us solve the scenario based on the experience and PAM form of contract.

Besides, I also attended the Fidic talk prepared by our university and CIPAA talk prepared by RICS. Both of the talk help me a lots.

Building Economic (QSB 3214)

In this module, I learned an overview and important of QS's role and responsibilities during the development process. I has been introduced to practical situations of the various method on controlling cost of the building in the design stage of a project.

The teaching objectives of the module are:
1.   To develop an awareness of the nature, content, and significance of cost control, cost planning and understand the roles of project teams towards fulfilling client needs.

2.   To develop awareness of the effect of design variables in obtaining an economical design and to appreciate the role of the quantity surveyor in pre- and post-contract stages.

Our lecturer, Ms. Azrina explain and teach us very well. She also guide us when we preparing the work for assignment. We required to prepare cost plan and tender report in the assignment.

Through out the period, I able to explain various of pre-tender estimating and able to produce an estimate at pre-tender stage, cost plan based on historical data and S-curce for financial planning to a proposed project.

Financial Management (QSB 3413/3414)

In this module, I learned some accounting and financing management in relation to construction project.

The teaching objective of the module are:

  1. Understand the detail of financial management in relation to construction
  2. To appraise capital investment proposal in the construction industry
  3. Understand the managing of the business environment, the firm and the staff in the construction  organisation

I never studied accounting before therefore this module make me have a difficult period on study this module. I spend lots of time on this module. Fortunately, our lecturer, Mr. Lai prepared lots of exercises on each topic. 

During the lecture class, lecturer also explain a lots to us but sometime there are too many things teach in the same time its really hard to absorb all everything. We discussed all the exercise work during the tutorial class. Mr. Lai explain the question step by step, let me more understand to each question. 

I think is module is the only module make me spent lots of time on studying it. 

Research Methodology (QSB 3933)

Semester 5 is the 1st sem of Final Year, we need to start doing Thesis.

Module Teaching Objectives
1. To develop awareness of the current local and global issues in the construction industry.
2. To explore the approaches to research.
3. To demonstrate a systematic and orderly mind to produce a viable academic research.

This module is let us have more understanding on how to prepare the Chapter 1 - Research Proposal and Chapter 2 - Literature Review of the thesis.

First, we need identify the interested area for research and then the lecturer - Ms. Aishah distribute us to individual supervisor. My supervisor - Mr. Leong, lead me and guide me to the right way to prepare both research proposal and literature review.

Besides, Ms. Aishah also invite librarian to introduce and teach us how to do the references. 

Construction Quantity Surveying (MGT 60603)

From this module, I learned the role of contractor's QS and the understand the difference between  contractor's QS and consultant's QS.

During the commencement of the project, running the project and end of the project, contractor's QS prepare, involve and do more work compare to Consultant's QS. Contractor's QS need to take care of all the consultant and also the sub-contractors however as a consultant's QS do not need to pay too much attention on them.

Besides, I also have more understanding about the major Laws and Regulations of the Malaysia's construction industry involved such as

  • Contract Act 1950
  • Factories and Machinery Act 1967
  • Real Property Gain Tax Act 1967
  • Workmen's Compensation Act 1952
  • Strata Titles Act 1985
  • Employer Social Security Act
  • Construction Industry Development Board Act 1994
  • Construction Industry Payment & Adjudication Act 2012 (CIPAA 2012)
  • Occupational Safety & Health Administration 1994 (OSHA 1994)
  • Goods & Services Tax (GST)


In additional, I also have more understanding about Public Private Partnership (PPP) procurement route which adopted by the public sector to meet long term public sector needs such as highways, ports, power stations and etc.

The various form of PPP are:

  • Private Finance Initiative (PFI)
  • Build - Transfer (BT)
  • Build - Lease - Transfer (BLT)
  • Build - Transfer - Operate (BTO)
  • Build - Operate - Transfer (BOT)


In this module, I feel that contractor's QS is much more challenging compare to consultant's QS.