Sunday, 6 July 2014

Measurement 4 (QSB2125)

Measurement 4 is the main unit for this semester 4. Without passing this unit, we are not allow to go for the intern-ship.

Sr. Chang is the lecturer for this unit. Form this unit, we learnt how to measure for bored piles, demolition works and various external work such as drainage, sewage, water reticulation and etc. Besides, we also learn from the SMM2.

For the measurement 4 assignment, this is the first time for us to measurement and calculate for one unit of terrace house. From this assignment, we need to refer back to the previous work and measurement that we learnt in the last few semester. From this assignment, we did a lots of revisions.

In the end, we also need to prepare for the tender document.